In conjunction with the installation of utilities to the Elson S. Floyd Cultural Center, six (6) parking stalls located in the Yellow 3 parking lot south of Washington Street and north of Spokane Street will be used by the construction team and not available for employee parking from Monday, July 18, through Friday, July 22. Additionally, there will be minimal truck traffic through the parking lot. Please be observant in this construction area and drive safely. Thank you and “GO COUGS”
Brian G. Funke
Construction Manager / Electrical Examiner