The walkways around Webster Hall will be under construction through September. Please follow the signs installed around the building, and plan to arrive early. To help with entering and exiting between classes, please enter the auditoriums Webster 11, 16, and 17 from the south door of the Shock Physics building (Entrance C), and exit the auditoriums through the lower doors of the auditorium to the basement floor of Webster. Webster B8 and B12 can be accessed via the south basement entrance of Webster (Entrance B). From the north side of Webster (Entrance A), use the stairs or elevators to the Basement floor (2 floors down) to access all classrooms. Persons with mobility challenges should access all classrooms and auditoriums through Webster’s south basement doors (Entrance B).
We appreciate your patience during construction. Go Cougs!
Cyndi Arbour
335-7010