Sept 2 – 25: Infrastructure Work on Grimes Way

Starting Tuesday, Sept. 2, and concluding Thursday, Sept. 25, the PACCAR Environmental Technology (Clean Tech) Building will be connected to the campus infrastructure located along Grimes Way.  This construction activity will require temporary traffic revisions.  Both east and west traffic lanes will be shifted 40 feet north toward the greenhouses.  Lane width will be reduced.  Traffic speed will also be reduced.  Please follow directions provided on traffic signs and use caution in this area.

Sidewalks on the north and south side of Grimes Way between the greenhouses and the new PACCAR building will be closed.  Temporary pathways will be provided on the north side of the greenhouses.  Please follow pedestrian detour signage.

Thank you for your continued patience and support.  GO COUGS!

Brian G. Funke, Construction Engineer / Electrical Examiner, Facilities Services

The Notices and Announcements section is provided as a service to the WSU community for sharing events such as lectures, trainings, and other highly transactional types of information related to the university experience. Information provided and opinions expressed may not reflect the understanding or opinion of WSU. Accuracy of the information presented is the responsibility of those who submitted it. The self-uploaded posts are reviewed for compliance with state statutes and ethics guidelines but are not edited for spelling, grammar, or clarity.

Next Story

Commencement volunteers needed in Pullman

Any members of the WSU community who would like to volunteer can sign up for a time slot online. Breakfast and lunch will be provided.

Recent News

ROAR students win gold at Washington Special Olympics

WSU ROAR students helped lead the Whitman County Superstars to a gold medal at the Washington Special Olympics Winter Games, capping a season defined by teamwork, growth, and standout sportsmanship.