SCUE parking garage and Terrell Library concrete repair

There will be a small concrete repair project in SCUE parking garage and the Terrell Library on the Pullman campus. The contractor will arrive onsite December 30 to setup and begin demo and concrete repairs at SCUE parking garage on December 30-31. The contractor will return to Pullman campus on January 2 and begin demo and concrete repairs at Terrell Library.  It is anticipated that the construction will be completed by January 3. There will be noise and foreign odor (nonharmful, no VOC) present during construction.

The Notices and Announcements section is provided as a service to the WSU community for sharing events such as lectures, trainings, and other highly transactional types of information related to the university experience. Information provided and opinions expressed may not reflect the understanding or opinion of WSU. Accuracy of the information presented is the responsibility of those who submitted it. The self-uploaded posts are reviewed for compliance with state statutes and ethics guidelines but are not edited for spelling, grammar, or clarity.

Next Story

Recent News

Inside WSU’s student-run hackathons

Hackathons have become a defining space for student innovation, with two taking center stage this year.

WSU recognized for support of first-generation students

The university’s elevation to FirstGen Forward Network Champion reflects growing enrollment, improved retention, and expanded support programs helping first-generation students succeed.