The utility tie-in for the PACCAR building is complete and Grimes Way is open for normal traffic. Thank you for your patience during this construction phase.
As a reminder: Pedestrian traffic must continue to use the north sidewalk in this area as the south sidewalk is closed and blocked by the construction fence. Barricades are in place and are located at the crosswalks where pedestrians can safely cross the street to the north sidewalk. Please follow indicated pedestrian pathways. Thank you and GO COUGS!
Brian Funke, Construction Engineer/Electrical Examiner
Facilities Services