The CUB Elevator and Stair Tower will be closed to the public from 7/28/2014 to 8/19/2014, due to elevator service, and construction of a new elevator entry on second level of CUB tower connecting to the new Football Operations Building. The stairway east of the CUB Tower will remain open. Pathway revision for ADA passage will be through Terrell Library to Terrell Mall. Detour signs will be posted.
Thank You and “GO COUGS”
Brian G. Funke, Construction Engineer/Electrical Examiner, Facilities Services – Capital