CUB Elevator Pedestrian Pathway Revision Notice

The CUB Elevator and Stair Tower will be closed to the public from 7/28/2014 to 8/19/2014, due to elevator service,  and construction of a new elevator entry on second level of CUB tower connecting to the new Football Operations Building.  The stairway east of the CUB Tower will remain open.   Pathway revision for ADA passage will be through Terrell Library to Terrell Mall.  Detour signs will be posted.

Thank You and “GO COUGS”

Brian G. Funke, Construction Engineer/Electrical Examiner, Facilities Services – Capital

The Notices and Announcements section is provided as a service to the WSU community for sharing events such as lectures, trainings, and other highly transactional types of information related to the university experience. Information provided and opinions expressed may not reflect the understanding or opinion of WSU. Accuracy of the information presented is the responsibility of those who submitted it. The self-uploaded posts are reviewed for compliance with state statutes and ethics guidelines but are not edited for spelling, grammar, or clarity.

Next Story

Recent News

Student receives NASA graduate fellowship

Ian Wells, a mechanical and materials engineering graduate student, has won a NASA Space Technology Graduate Research Opportunities fellowship.

Summer schedule for WSU Insider

Look for news highlights in the daily push email most days Monday through Thursday through late August, with Friday emails resuming around the start of the fall semester.