WSU Pullman wireless network maintenance, March 2026

Information Technology Services (ITS) will perform scheduled wireless network upgrades that may impact connectivity in select WSU Pullman buildings on the following dates:

  • March 2–3: Cleveland Hall
  • March 4–5: College Hall
  • March 16–20: The Spark: Academic Innovation Hub
  • March 23–April 3: Fulmer Complex, Webster Physical Sciences Building

On these dates, small areas within these buildings may experience weak wireless signals or brief outages lasting up to 10 minutes. Wired internet connections will remain available in locations where they are already configured and active.

After each upgrade, individuals may need to reconnect to the wireless network in the affected buildings using their WSU credentials.

Learn more about upcoming WSU Pullman building wireless upgrades.

For questions or concerns, please contact Crimson Service Desk at crimsonservicedesk@wsu.edu or 509-335-4357.

The Notices and Announcements section is provided as a service to the WSU community for sharing events such as lectures, trainings, and other highly transactional types of information related to the university experience. Information provided and opinions expressed may not reflect the understanding or opinion of WSU. Accuracy of the information presented is the responsibility of those who submitted it. The self-uploaded posts are reviewed for compliance with state statutes and ethics guidelines but are not edited for spelling, grammar, or clarity.

Next Story

Recent News

Inside WSU’s student-run hackathons

Hackathons have become a defining space for student innovation, with two taking center stage this year.

WSU recognized for support of first-generation students

The university’s elevation to FirstGen Forward Network Champion reflects growing enrollment, improved retention, and expanded support programs helping first-generation students succeed.