Notice: Temporary access changes to Terrell Mall, CUB, and Gesa Field southside gates

The CUB tower elevator located between the football operations building and Compton Union Building on the Pullman campus is currently out of service. Stairways along this route are still available. The Holland Library elevator can be used to access Terrell Mall, CUB, and Gesa Field southside gates during this time. Entry points to the Holland Library elevator are located near the Holland Library entrance off of Glenn Terrell Mall, and the Holland Library garage entrance off of Cougar Way.

We apologize for any inconvenience this may cause and appreciate your patience and understanding as we work to resolve this issue.

For further information or assistance, please contact Karee Shaw, director of the Compton Union Building (karee.shaw@wsu.edu).

Thank you for your patience.

The Notices and Announcements section is provided as a service to the WSU community for sharing events such as lectures, trainings, and other highly transactional types of information related to the university experience. Information provided and opinions expressed may not reflect the understanding or opinion of WSU. Accuracy of the information presented is the responsibility of those who submitted it. The self-uploaded posts are reviewed for compliance with state statutes and ethics guidelines but are not edited for spelling, grammar, or clarity.

Next Story

Recent News

Inside WSU’s student-run hackathons

Hackathons have become a defining space for student innovation, with two taking center stage this year.

WSU recognized for support of first-generation students

The university’s elevation to FirstGen Forward Network Champion reflects growing enrollment, improved retention, and expanded support programs helping first-generation students succeed.