A testing consultant will be collecting pavement samples and roadway measurements along Stadium Way between Nevada Street and Grimes Way in the coming weeks. Any impacts or delays to motorists are expected to be brief and minor. Motorists can expect to see temporary traffic control features redirecting traffic for the safety of the survey crews as they collect their samples. Northbound and southbound travel will continue as work is conducted. Thank you for your patience. Please feel free to contact Adam Ferry at 509‑335‑9028 with any questions or concerns.
The Notices and Announcements section is provided as a service to the WSU community for sharing events such as lectures, trainings, and other highly transactional types of information related to the university experience. Information provided and opinions expressed may not reflect the understanding or opinion of WSU. Accuracy of the information presented is the responsibility of those who submitted it. The self-uploaded posts are reviewed for compliance with state statutes and ethics guidelines but are not edited for spelling, grammar, or clarity.
Next Story
Classified staff receiving 3% general salary increase effective July 1
By
RJ Wolcott, WSU News & Media Relations
Recent News
Student receives NASA graduate fellowship
By
Tina Hilding, Voiland College of Engineering and Architecture
Engineers will explore green future for food processing at WSU-hosted conference
By
Seth Truscott, College of Agricultural, Human, and Natural Resource Sciences
Carson College’s Amrita Lahiri named recipient of 2024 Library Excellence Award
By
Nella Letizia, WSU Libraries
Henry Rono’s long run: Remembering the Nandi Warrior
By
Communications staff, Washington State University
Voiland College of Engineering and Architecture names outstanding faculty and staff
By
Tina Hilding, Voiland College of Engineering and Architecture