This BPPM revision includes changes to the following section: Steam Tunnel Access 50.17
For a summary of the changes and links to the updated sections, see the BPPM Revision 515 memorandum at:
https://policies.wsu.edu/prf/index/revisions/bppm-manual-revisions/bppm-revision-515/
Contact: Office of Procedures, Records, and Forms; telephone 509-335-2005