Starting Tuesday, Sept. 2, and concluding Thursday, Sept. 25, the PACCAR Environmental Technology (Clean Tech) Building will be connected to the campus infrastructure located along Grimes Way. This construction activity will require temporary traffic revisions. Both east and west traffic lanes will be shifted 40 feet north toward the greenhouses. Lane width will be reduced. Traffic speed will also be reduced. Please follow directions provided on traffic signs and use caution in this area.
Sidewalks on the north and south side of Grimes Way between the greenhouses and the new PACCAR building will be closed. Temporary pathways will be provided on the north side of the greenhouses. Please follow pedestrian detour signage.
Thank you for your continued patience and support. GO COUGS!
Brian G. Funke, Construction Engineer / Electrical Examiner, Facilities Services