vancouver Smith ATC applied technology building semiconductor lab laboratory legislature Washington classroom

Tech buildings at top of legislative capital request

  Top priority in the capital budget for 2009-2011 is the Applied Technology Classroom building at WSU Vancouver (see ONLINE @ www.olympia.wsu.edu/Budget.aspx). If the 2009 Legislature approves WSU’s request, the $42.6 million, four-story structure — and its smaller companion laboratory building — will begin construction next summer. Together, they will serve students, faculty and the […]