Two combustion turbines powered by natural gas will be the heartbeat of WSU’s electric generation system, if the Board of Regents gives its approval May 10 for a new university power plant. The proposal calls for a 28-megawatt combined heat-and-power production system to be built on east Grimes Way at Olympia Ave., below Jewett Observatory. […]