Summer construction season is here for the Pullman campus. Facilities Services will be accomplishing several projects around campus that will affect pedestrian and road traffic. These projects include: Resurfacing SE Stadium Way between SR-270 and Nevada Street, resurfacing SE Spokane Street from Washington to Stadium Way, resurfacing SE Columbia Street from Spokane Street to Idaho Street, resurfacing NE Thatuna Street from Cougar Way to Campus Ave, underground tunnel repairs at three locations on College Ave, and water meter installations at various locations. Crack sealing of campus roads will be accomplished in June. Impacts will vary with each project, expect traffic detours, flaggers, and possible delays.
See link below for map of the locations and the approximate construction dates.
http://couggis.wsu.edu/maps/announcements/summerprojects2018.pdf
In addition, Avista Utility company is replacing natural gas lines all over Pullman, including the campus, see link below for details on their project. Their work may also affect traffic.
https://myavista.com/about-us/services-and-resources/current-avista-projects