Totally tubular but evolving

Construction of the WSU Spokane Academic Center is under way with ground having been broken in May. The sight currently features excavation and column construction. The $33.8 million, 106,000-square-foot building will be located between the Health Sciences Building and the Phase I Classroom Building, with completion scheduled for fall 2006.







 The Academic Center will provide space critical to expansion of academic programs and support for core educational functions, particularly the library. For more information on the building, click here for details and photos. To see a real-time photo of the site, click here to go to the WSU Spokane campus web cam

Next Story

Students design outdoor story walk for Keller schools

A group of WSU landscape architecture students is gaining hands‑on experience by designing an outdoor classroom with members of the Confederated Tribes of the Colville Indian Reservation.

Recent News

E-tongue can detect white wine spoilage before humans can

While bearing little physical resemblance to its namesake, the strand-like sensory probes of the “e-tongue” still outperformed human senses when detecting contaminated wine in a recent WSU-led study.

Provost selection process ongoing

WSU expects to name its next provost before the end of April. President Kirk Schulz is actively considering two finalists, with feedback provided by the university community being a key factor in the decision.

Employee Assistance Program hosts special sessions, April 17

Washington State Employee Assistance Program Director Jennifer Nguyen will lead two discussions tomorrow on the topics of change and personal wellbeing. Both presentations will be livestreamed.